A few updates since last time:
There are now two completed wall sections. As I was doing a test assembly, I found out that I needed to lengthen the walls. Hopefully, it won't be too noticeable once they're painted.
The doors have been assembled and primed. I still have to make the hydraulic latches that are seen in the rectangular cutouts.
The padding around the door has also been glued in place and primed.
A quick fit check.
I got a base coat of yellow oxide down on the pads.
The pads for the ceiling have also been started. These will now have to be lengthened to match the new wall length.
No comments:
Post a Comment